Previous Stabby posts here.
I've completed the 170 squares that make up Stabby's head.
Now, I'm cleaning the glass and the gaps around the squares. Allison has floor to ceiling windows in her condo, and these windows will be facing the mosaic and shining some pretty bright light on Stabby at times. I want the gaps and any exposed cement to be as clean and neat as possible.
Next, I will use some black cement colorant to darken most of the exposed charcoal cement, especially the gaps around the squares.
The Wedi washers that you see were used to attach the Wedi panel to a wood support frame on the back. I'll attach a metal floater frame—Allison's choice—to that wood frame, and also install the hanging hardware onto the wood frame. I don't trust the metal hangers that come with the floater frames; they tighten into the frame with tiny set screws and I feel that I need more robust hangers for such a large mosaic.
I'll be visiting Allison in San Jose in June. It looks like I will be able to arrange for it to be delivered while I am there, and the two of us can hang it. We are both excited to see it on her wall.